8372
博碩士論文
Absorption chiller , Power generation , Gas turbine
It takes 3~5 years to finish a power plaint project including location, reliability, environment evaluating, investigation, etc. In addition, it is difficulty to get a right place and hinder by the environment protection. So, it is an important class on boosting the existing power generation capacity.It was used to enhance power generation capacity by increasing the combustion chamber temperature in traditional way. However, it not only increases the exhaust temperature of gas turbine, but also ...